single mention · post-training
Adaptive Rollout Scheduling
Schedules rollouts to balance long-run generation demand against progress toward the current training batch.
The sources on this page only mention it in passing. The line above is the extraction's one-line gloss. See rollout & RL infrastructure for the methods filed beside it.
Filed under post-training › rollout & RL infrastructure